Completion date: June 25, 2013

Owner: Bridgepoint Active Healthcare

Architecture: Stantec Architecture/KPMB Architects (planning, design, and compliance architects); HDR Architecture/Diamond Schmitt Architects (design, build, finance, and maintain architects).

Interior design: Stantec Architecture/KPMB Architects (planning, design, and compliance architects); HDR Architecture/Diamond Schmitt Architects (design, build, finance, and maintain architects)

Engineering: Smith + Andersen, Halsall Associates

Construction: PCL Construction

Total building area: 680,000 sq. ft.

Total construction cost: $380 million

Art/pictures: Clifford Restoration Limited

AV equipment/electronics/software: Nationwide Audio Visual, Novita Techne

Carpet/flooring: York Marble, Tile and Terrazzo Inc.

Ceiling/wall systems: Oakdale, Beaubois

Doors/locks/hardware: Upper Canada Specialty Hardware

Fabric/textiles: Solarfective Products Limited

Furniture—seating/casegoods: Workplace Resource

Handrails/wall guards: C/S Construction Specialties

Headwalls/booms: Class 1 Inc.

Lighting: Plan Group

Signage/wayfinding: WSI Sign Systems Ltd.

Surfaces—solid/other: Beaubois

Windows: Sota Glazing Inc.

Paint: 3 Bell Painters, Sherwin-Williams

To read more about Bridgepoint Active Healthcare's new hospital project,  please see "What’s Old Is New Again At Bridgepoint Active Health."