Completion date: May 2012

Owner: Boston Medical Center

Architecture: Tsoi/Kobus & Associates

Interior design: Tsoi/Kobus & Associates

Contracting: Suffolk Construction

Engineering: MEP Engineers–AKF Group

Construction: Suffolk Construction

Total building area: 4,000 square feet

Total construction cost:$1,110,000 and $350,000 for A/V

Cost/sq. ft.:$365

AV equipment/electronics/software: Acentech

Carpet/flooring: Bio-Based Tile by Armstrong

Ceiling/wall systems: Armstrong Ceiling Tile, Gypsum Board Wall w/ Paint

Doors/locks/hardware: Von Duprin (standard Mortise Locks)

Furniture—seating/case goods: Herman Miller–Caper chairs

Handrails/wall guards: Roppe Rubber Wall Base

Lighting:  Corelite

To read more on the transformation of Boston Medical Center's simulation center, please see "Practice Makes Perfect At Boston Medical Center's Simulation Center."