Project Summary 

Completion date: December 2014

Owner: The Ohio State University Wexner Medical Center

Total building area: 1.1 million sq. ft. (new James); 100,000 square feet of renovations (existing James)

Total construction cost: $750 million

Architecture: HOK, Moody Nolan (associate architect)

Interior Design: HOK

Contracting: Turner Construction and Lend Lease

MEP engineer: Bard, Rao + Athanas, Prater Engineering Associates (associate MEP engineer)

Structural engineer: Thorton Thomasetti

Construction: Turner Construction and Lend Lease

Art/pictures: Lendrum Fine Art

AV equipment/electronics/software: SoundCom Systems, UTouch, SNA, Pentagram, Potion

Carpet/flooring: Shaw, Forbo, Johnsonite

Ceiling/wall systems: Ceiling Plus, USG, Barrisol

Doors/locks/hardware: Sargent, Stanley, Rockwood

Fabric/textiles: Anzea, Architex, Arc Com, Brentano, Concertex, Designtex, Maharam, Pollack, Sina Pearson, Spinneybeck

Furniture: Carolina, Coalesse, Steelcase Health, Allermuir, Andreu World, Martin Brattrud, Niemkamper, DIRTT, Jofco, Nemschoff, HBF

Handrails/wall guards: InPro Corp.

Lighting: Focal Point, Cooper Lighting, Traxon Technology, LBL Lighting

Signage/wayfinding: Designer Sign Systems

Surfaces – solid surface: Formica, Corian

Surfaces – laminate: Wilsonart, Formica

Wallcoverings: Knoll, Maharam, Carnegie, Vycon, Arcom, Designtex, MDC, DL Couch

Other: Sensitile

To read more about the project, see “Rewriting The Playbook: James Cancer Hospital” or check out Healthcare Design‘s September issue.